Draft Sidewalk Master Plan

Share Draft Sidewalk Master Plan on Facebook Share Draft Sidewalk Master Plan on Twitter Share Draft Sidewalk Master Plan on Linkedin Email Draft Sidewalk Master Plan link
closeup of a sidewalk and shoes walking on it

Over the years the Town of Huntsville has identified a need to improve the pedestrian network in the community.

Some of the strategic goals developed from the Municipality's strategic Plan was to prepare a multi-year sidewalk capital plan and improve pedestrian linkages throughout the Town. These goals are embodied in the Strategic Plan under Roads and Infrastructure, Transportation, objectives RdINF 1.5 & 1.6.

Discussion

The purpose of this plan is to identify existing infrastructure, develop a plan for major sidewalks, minor sidewalks, multi-use pathways and set standards for future growth.

The goals of the Town of Huntsville’s Sidewalk Master Plan are:

  • Enhance sidewalk network including but not limited to; adding new sidewalks, connect existing disjointed sidewalks, removal of abandoned sidewalks, future removal of non-warranted sidewalks, connection to trails, and upgrade undersized sidewalks.
  • Plan and establish a network of major sidewalks throughout the Municipality to facilitate planning of future sidewalks in and among neighbourhoods.
  • Improve walkability and safety for Pedestrians walking throughout the municipality students travelling to/from school
  • Expand connectivity to community facilities (trails, parks schools, etc.) for residents.
  • Improve community walkability and disabled persons’ accessibility to sidewalk network. AODA Compliant.
  • Improved Existing Intersection Crossings. AODA Compliant.
  • Integration of crosswalks where required and AODA Compliant.
  • Create a framework for implementing sidewalk construction and project prioritization.
  • Reduce maintenance costs.
  • Sidewalk planning and coordination with the Downtown Master Plan and Capital Improvement Plan.


Over the years the Town of Huntsville has identified a need to improve the pedestrian network in the community.

Some of the strategic goals developed from the Municipality's strategic Plan was to prepare a multi-year sidewalk capital plan and improve pedestrian linkages throughout the Town. These goals are embodied in the Strategic Plan under Roads and Infrastructure, Transportation, objectives RdINF 1.5 & 1.6.

Discussion

The purpose of this plan is to identify existing infrastructure, develop a plan for major sidewalks, minor sidewalks, multi-use pathways and set standards for future growth.

The goals of the Town of Huntsville’s Sidewalk Master Plan are:

  • Enhance sidewalk network including but not limited to; adding new sidewalks, connect existing disjointed sidewalks, removal of abandoned sidewalks, future removal of non-warranted sidewalks, connection to trails, and upgrade undersized sidewalks.
  • Plan and establish a network of major sidewalks throughout the Municipality to facilitate planning of future sidewalks in and among neighbourhoods.
  • Improve walkability and safety for Pedestrians walking throughout the municipality students travelling to/from school
  • Expand connectivity to community facilities (trails, parks schools, etc.) for residents.
  • Improve community walkability and disabled persons’ accessibility to sidewalk network. AODA Compliant.
  • Improved Existing Intersection Crossings. AODA Compliant.
  • Integration of crosswalks where required and AODA Compliant.
  • Create a framework for implementing sidewalk construction and project prioritization.
  • Reduce maintenance costs.
  • Sidewalk planning and coordination with the Downtown Master Plan and Capital Improvement Plan.


  • Thank you participants

    Share Thank you participants on Facebook Share Thank you participants on Twitter Share Thank you participants on Linkedin Email Thank you participants link

    The survey is now closed, our next steps are to compile the survey results, make any necessary changes to the master plan based on survey data and report back to Council with costing at a later date to be determined. Thank you to all who participated.

  • Presentation to General Committee - Jan 27, 2021

    Share Presentation to General Committee - Jan 27, 2021 on Facebook Share Presentation to General Committee - Jan 27, 2021 on Twitter Share Presentation to General Committee - Jan 27, 2021 on Linkedin Email Presentation to General Committee - Jan 27, 2021 link

    Watch the sidewalk draft master plan presentation here:

  • Draft Sidewalk Master Plan Engagement Opportunities

    Share Draft Sidewalk Master Plan Engagement Opportunities on Facebook Share Draft Sidewalk Master Plan Engagement Opportunities on Twitter Share Draft Sidewalk Master Plan Engagement Opportunities on Linkedin Email Draft Sidewalk Master Plan Engagement Opportunities link

    Interactive map

    Open interactive sidewalk map.

    Feedback Survey

    Have your say in the Draft Sidewalk Master Plan Survey and help expand the community's sidewalk framework.

  • Staff Report to Committee

    Share Staff Report to Committee on Facebook Share Staff Report to Committee on Twitter Share Staff Report to Committee on Linkedin Email Staff Report to Committee link

    Staff report number OPS-2021-05 - Draft Sidewalk Master Plan, will be presented to General Committee on Wednesday, January 27, 2021.

    Update: Here is the youtube video link to watch the presentation.

    You can watch the livestream of the meeting here, beginning at 9am: huntsville.ca/livemeeting

Page published: 26 Jan 2021, 02:01 PM